Drill Pad & Access Road Construction
Our small fleet of heavy equipment and operators allows us to easily build roads and form drill pads.
Roads and pads with our own equipment
Getting a rig onto a target means building the road to it and forming the pad under it first. We do that work ourselves: our small fleet of heavy equipment and operators allows us to easily build roads and form drill pads.
That has included work “under sometimes difficult site (including winter) conditions,” as Timberline Resources Corporation put it in their letter, while running “a well-organized and clean operation.”
Sumpless drill pads
Environmental needs are attainable with our sumpless drill pad option.
If a permit or surface agreement limits ground disturbance on your program, ask about a sumpless pad when you request a bid.
Reclamation
Fig. 1 shows a hillside pad being regraded during reclamation after a program wrapped. Full reclamation when the program wraps is part of the work.
Tell us about the site
Call 602-329-6330 or use the contact form. Tell us about your target, ground conditions, and program length — we will get back to you with how we would approach the project.
Request a bid