Sheet 01Drill pads and access roadsFig. 1
← All services

Drill Pad & Access Road Construction

Our small fleet of heavy equipment and operators allows us to easily build roads and form drill pads.

Fig. 1Site reclamation after program completionPhoto: BSE
Sheet 02Roads, pads, and the ground afterIn-house equipment

Roads and pads with our own equipment

Getting a rig onto a target means building the road to it and forming the pad under it first. We do that work ourselves: our small fleet of heavy equipment and operators allows us to easily build roads and form drill pads.

That has included work “under sometimes difficult site (including winter) conditions,” as Timberline Resources Corporation put it in their letter, while running “a well-organized and clean operation.”

Sumpless drill pads

Environmental needs are attainable with our sumpless drill pad option.

If a permit or surface agreement limits ground disturbance on your program, ask about a sumpless pad when you request a bid.

Reclamation

Fig. 1 shows a hillside pad being regraded during reclamation after a program wrapped. Full reclamation when the program wraps is part of the work.

Project inquiry602-329-6330

Tell us about the site

Call 602-329-6330 or use the contact form. Tell us about your target, ground conditions, and program length — we will get back to you with how we would approach the project.

Request a bid